Barrier ID | Site Name | Watershed Name | Type of Rehabilitation | Rehabilitated By | Rehabilitated Date | Habitat Gain (km)* | Actual Project Cost ($) | Next Step | Notes | Supporting Links |
|---|---|---|---|---|---|---|---|---|---|---|
62245 | Tobermory Cr @ Elk R Main FSR | ELKR | Replacement - OBS | BCTS | 2022-09-30 | 5.33 | NULL | Post-rehabilitation monitoring | https://a100.gov.bc.ca/pub/pscism | |
62505 | NULL | ELKR | Replacement - OBS | CWF | 2023-09-30 | 0.25 | 251000 | Correct deficiencies (rehabilitated structures only) | NULL | https://www.newgraphenvironment.com/fish_passage_elk_2020_reporting/appendix---50152---tributary-to-lizard-creek.html |
Progress Summary
This WCRP process was initiated in 2020 with a series of workshops completed with local partners and rightsholders, and the first WCRP was published in 2022. Since inception, the passability of 167 structures has been assessed, and further habitat confirmations were completed at 9 of these. In-depth habitat investigations were also completed for barriers in Brule, Weigert, Lodgepole and Bean creeks, and in select tributaries to Bighorn and Morrissey creeks. Fish passage has been rehabilitated at 2 barriers (unnamed tributary to Lizard Creek at Mount Fernie Park Road and Tobermory Creek at Elk River Main FSR), resulting in improved or restored access to 5.58 km of habitat. Designs for rehabilitating a barrier on Stove Creek in the Lizard Creek drainage have also been completed.
Rehabilitated Barriers
Table 9: Westslope Cutthroat Trout barriers in the Elk River (Qukin ?amak?is) upstream of Elko Dam that have been addressed (either through removal, replacement, or modification to improve passage) as of April 2026. Habitat gain represents the amount (km) of habitat that was reconnected by these projects.
Annual Progress Report
Since April 1, 2025, the following actions were completed:
Results of barrier assessments and habitat confirmations completed in 2024 were incorporated into the model.
Habitat permanently altered by mining was delineated and amount (km, % of total) of habitat permanently altered by mining was calculated upstream and downstream of Elko Dam.
The connectivity models were updated based on the above actions, and outputs were incorporated into this WCRP.
Priority Barriers
Barrier ID | Site Name | Watershed Name | Structure Owner | Structure Type | Partial Passability | Partial Passability Details | Number of Structures in Set | Habitat Gain (km)* | Next Step |
|---|---|---|---|---|---|---|---|---|---|
1004602974 | Grace Cr @ Line Rd (4602947) | ELKR | CanWel Forest Products | Stream crossing - CBS | Unknown | NULL | 1 | 3.24 | Engage with barrier owner |
13635d39-ee0f-4d0c-bb9c-9649ac9a5c63 | Harmer Cr Dam (1100001086) | ELKR | Teck | Dam | No | NULL | 1 | 5.47 | Rehabilitation |
197533 | Brule Cr @ Busato Rd | ELKR | MOTI | Stream crossing - CBS | No | NULL | 2 | 0.13 | Commission engineering designs |
197534 | Weigert Cr @ Hwy 43 | ELKR | MOTI | Stream crossing - CBS | Yes | Proportion of individuals | 1 | 10.32 | Commission engineering designs |
197542 | Hartley Cr @ Dicken Rd | ELKR | MOTI | Stream crossing - CBS | Unknown | NULL | 3 | 0.01 | Rehabilitation |
197559 | Brule Creek @ Hwy 43 | ELKR | MOTI | Stream crossing - CBS | No | NULL | 2 | 21.56 | Commission engineering designs |
197825 | Henretta Cr @ unnamed | ELKR | Teck | Stream crossing - CBS | Unknown | NULL | 1 | 10.00 | Commission engineering designs |
197827 | Fording R @ FRO Coal Haul Rd (4600762) | ELKR | Teck | Stream crossing - CBS | Unknown | NULL | 1 | 21.01 | Rehabilitation |
50152 | Stove Creek | ELKR | BC Parks | Stream crossing - CBS | No | NULL | 1 | 0.36 | Fundraise |
50185 | Trib to Morrissey Cr @ River Rd | ELKR | CanFor | Stream crossing - CBS | Yes | Proportion of individuals | 1 | 2.89 | Engage with barrier owner |
62181 | Dry Cr @ Railway | ELKR | CP Rail | Stream crossing - CBS | Unknown | Other (see notes) | 2 | 4.53 | Rehabilitation |
62182 | Dry Cr @ Fording Hwy | ELKR | MOTI | Stream crossing - CBS | Unknown | NULL | 2 | 0.03 | Rehabilitation |
62416 | NULL | ELKR | CanWel Forest Products | Stream crossing - CBS | Unknown | NULL | 1 | 0.98 | Commission engineering designs |
98a6d14e-ea75-446a-80e5-8709bf2eb8e9 | Hartley Cr @ dam 1 | ELKR | Dam | Proportion of individuals | 3 | 0.04 | Engage with barrier owner | ||
e86b513c-3dce-4b4a-a49e-e86e4dac935e | Hartley Cr @ dam 2 | ELKR | NULL | Dam | NULL | Proportion of individuals | 3 | 7.83 | Engage with barrier owner |
Barrier ID | Site Name | Watershed Name | Structure Owner | Structure Type | Partial Passability | Partial Passability Details | Number of Structures in Set | Habitat Gain (km)* | Next Step |
|---|---|---|---|---|---|---|---|---|---|
197786 | 1004606398 | ELKR | CanFor | Stream crossing - CBS | NULL | 1 | 0.51 | Engage with barrier owner | |
197787 | 1004606370 | ELKR | CanFor | Stream crossing - CBS | Yes | Proportion of time | 1 | 1.15 | Engage with barrier owner |
197844 | 1004605514 | ELKR | CanFor | Stream crossing - CBS | No | NULL | 1 | 1.71 | Engage with barrier owner |